Upgrading an HA Controller Cluster
Upgrading a running HA cluster is a node-by-node rolling operation. There's no special cluster-wide procedure; you bring each controller down, replace its binary, and bring it back up, then move to the next one. Routers and SDK clients stay connected throughout, falling over to other controllers as nodes cycle.
The one thing that's different from upgrading a standalone controller is that the cluster will be in version-mismatch read-only mode for the duration of the rolling upgrade. Reads continue to work; writes (model updates, terminator creation) are blocked until every node is on the new version. The window is bounded by how long the upgrade takes overall, not by which node you upgrade first.
At a glance:
- Take a database snapshot from a controller.
- Pick a node. If it's the leader, run
transfer-leadershipfirst. - Stop the controller, replace its binary, start it again.
- Wait for the cluster to recognize it as healthy.
- Repeat for each remaining node.
The rest of this page walks through each step, then covers routers and SDK clients, the Helm chart, and what to do if the upgrade goes wrong.
Before You Upgrade: Snapshot the Cluster
Take a database snapshot before any controller binary upgrade. The controller will apply schema migrations on startup the first time the new binary runs, and that schema change is one-way. If the upgrade goes badly, the only way back to the previous version is to restore from a snapshot taken before the migration ran.
The snapshot is always created on the controller you're talking to, using whichever
of its peers' state that controller currently has. Take the snapshot from the
cluster leader so the snapshot is as up-to-date as possible. Identify the leader
with ziti agent cluster list (or ziti ops cluster list over REST).
There are two equivalent ways to trigger the snapshot.
Via the IPC agent, on the same host as the leader controller:
ziti agent controller snapshot-db /var/lib/ziti/controller/backups/pre-upgrade.db
Via the management REST API, from anywhere the ziti CLI is logged in against
the leader:
ziti fabric db snapshot /var/lib/ziti/controller/backups/pre-upgrade.db
Either way:
- The path argument is interpreted by the controller process, not the CLI, so the directory must be writable from the controller's perspective. (For REST, the CLI just passes the path through; nothing is written on the client.)
- The output is a bolt DB snapshot in the format the Total Cluster Loss recovery paths consume.
- You only need one snapshot per upgrade -- the cluster's model is consistent across all controllers, so snapshotting more than one node is redundant.
Keep both the snapshot and the previous controller binary somewhere safe until you've confirmed the upgrade is working. They're the two ingredients of a rollback.
The Procedure: Rolling Upgrade
Once you have a snapshot, upgrade controllers one at a time. Pick whichever node you want to upgrade first; the order doesn't change the read-only window or the end result. A small step that's worth taking for the current leader is to move leadership off it before stopping it, so the cluster does a controlled handoff instead of waiting for an election to fire.
Per node:
-
If this is the leader, transfer leadership off it.
ziti agent cluster transfer-leadershipWithout a target argument, the cluster picks an eligible voter (preferring any node marked
preferredLeader: true). You don't strictly have to do this -- if you just stop the leader, the surviving voters will elect a new one in a few seconds -- but a clean transfer avoids the shortClusterHasNoLeaderErrorwindow during the election. -
Stop the controller.
With systemd,
systemctl stop ziti-controller. Otherwise, send the process aSIGTERMand wait for it to exit cleanly. -
Replace the binary.
Install the new version of
ziti(or the controller-specific package, depending on how you deploy). The on-disk state incluster.dataDirand the PKI directory don't change. -
Start the controller.
systemctl start ziti-controlleror your equivalent. On startup the new binary will detect any pending schema migration and apply it before opening listeners. -
Confirm the node has rejoined the cluster.
From any controller,
ziti agent cluster listshould show the upgraded node asConnected: trueand reporting the new version. Wait until you see that before moving to the next node -- it confirms the node is back in the mesh and has caught up on any journal entries it missed during the restart.
Repeat for each remaining controller. When the last node finishes its upgrade and reports the new version, the cluster automatically exits read-only mode and writes work again.
Don't Worry About Order
Two notes about ordering that come up:
- It doesn't matter whether you upgrade the leader first or last. The read-only mode kicks in as soon as any peer is at a different version, and clears only when all peers match. The total read-only window is the duration of the rolling upgrade, not the duration after the leader is touched.
- It doesn't matter which non-leader node you do first. Pick the most convenient.
The leadership-transfer step in (1) is purely about avoiding a brief leaderless window, not about ordering correctness.
The Read-Only Window
The cluster enters read-only mode the moment any peer reports a different version from the local controller's, and stays there until every peer reports the same version. During this window:
- Reads work normally on every controller. Clients can authenticate, look up services, and create circuits.
- Writes return an error. Specifically, write attempts get
unable to execute command. In a readonly state: different versions detected in cluster. This includes the easy-to-miss case: terminator creation, which fires whenever an SDK hosting application connects or restarts. Hosting apps that come up during the window will fail to register; their services won't be reachable until you finish the upgrade.
Some details that surprise people:
Exact version-string match
The version comparison is exact-string equality on the build-time version, not
semver-aware. v1.6.5 and v1.6.6 mismatch. v2.0.0 and v2.0.1 mismatch.
v2.0.1 and v2.0.1-rc1 mismatch. Dev builds (v0.0.0) only match other dev
builds.
This means any rolling upgrade triggers the read-only window, including a patch release. There's no "safe within a patch series" carve-out.
Plan SDK hosting work around the window
The single most disruptive effect of the window is on SDK hosting apps that need to register terminators during the upgrade. If you have hosting apps that restart frequently or that depend on terminator registration succeeding within a few seconds of startup, schedule the rolling upgrade for a window where you can tolerate failed registrations, or stage the hosting-app restarts to before or after.
Existing terminators stay in place across the upgrade; the read-only mode only blocks new writes, not previously-committed ones. So already-running hosting apps with terminators in place keep serving connections fine.
The window can't be shortened by order
As covered in the previous section: which node you upgrade first doesn't change the total read-only duration. The window starts when the first upgraded peer joins and ends when the last unupgraded peer is replaced. The only way to make it shorter is to make the rolling upgrade itself faster.
Routers and SDK Clients
Routers and SDK clients have no hard version gate with controllers. An older router can connect to a newer controller and vice versa; the connection succeeds and features that the older side doesn't understand simply aren't used. The same is true for SDK clients. So you can upgrade controllers without coordinating router or SDK versions, and you can upgrade routers without first upgrading controllers.
SDK compatibility is the strongest contract
Of the three components, the SDK has the strongest backward-compatibility commitment. Once an SDK is shipped into client applications, it can be effectively impossible to upgrade (mobile apps, embedded devices, third-party integrations), so the project treats SDK API breakage as a serious bug. You should generally be able to upgrade controllers and routers without touching the SDK side at all.
Routers and controllers: keep the skew small
Router-controller compatibility is shimmed, not gated. An older router talking to a newer controller (or vice versa) connects fine and falls back to whatever feature set both sides understand. A small version gap during a rolling upgrade is normal and expected.
A larger skew is best avoided. Bugs that only show up when the router and controller are far apart in version do creep in occasionally, and the regression-test coverage is naturally weaker for distant version pairs. Keep router upgrades within a release or two of the controller version you're running, and avoid leaving multi-major-version gaps in place for long.
Router upgrade procedure
Routers upgrade independently. Stop the router, replace the binary, start it. Established circuits flowing through the router will be torn down on restart and re-created against the surviving routers; that's the same behavior as a router restart for any other reason. There's no cluster-wide coordination needed.
If you have many routers and want to minimize circuit churn, upgrade them one at a time so most of the data plane is always available, and let SDK clients fail over to other paths as each router cycles.
Draining a hosting router before upgrade
If the router you're upgrading is hosting terminators for services, you can drain it before the restart so existing traffic finishes cleanly while new traffic prefers other paths. On the host running the router:
ziti agent router quiesce
This marks every terminator on this router as failed in the controller's data model. The terminator records aren't deleted; they're flagged so that the controller stops picking them for new circuit creation as long as some other healthy terminator for the service exists. Existing circuits keep flowing.
Once new traffic has moved off, stop and upgrade the router. If you change your
mind before the restart, the operation is reversible with ziti agent router dequiesce.
After the upgrade, run dequiesce on the restarted router. SDK-hosted
terminators heal automatically when the hosting application reconnects, because the
SDK creates fresh terminators on connect. Most other terminators need an explicit
dequiesce:
- Manually created terminators (created via the REST API and bound to a specific router) aren't recreated on restart, so without dequiesce they stay in the failed state and the service stays unreachable through that router.
- Edge-router-tunneler terminators are also generally left in place rather than recreated. The router caches terminator IDs so that on reconnect it can tell the controller "these terminators are still good" instead of re-registering them -- which is great for normal restarts, but it also means a quiesced terminator stays quiesced through the restart and needs an explicit dequiesce afterward.
Running dequiesce post-upgrade is safe in all cases. If every terminator on the router has already healed on its own, dequiesce is a no-op.
Future versions of OpenZiti will likely extend quiesce to also raise the router's routing cost to its maximum, so the router stops being used for transit traffic as well as for terminator hosting; dequiesce will then drop the cost back to its previous value. The drain pattern shown here is forward-compatible with that change -- you'll get a broader drain "for free" when the feature lands.
Quiesce only helps if there's another router available to host the same service. A single hosting router has nowhere to drain to, so quiesce on it will just stop new connections from being accepted until the upgrade finishes and the terminators come back.
Helm Chart Upgrades
The official OpenZiti Helm chart (openziti/helm-charts/charts/ziti-controller)
deploys an HA cluster as one Helm release per controller node, not one release
with multiple replicas. Each release is a single-replica Deployment with
strategy: Recreate, backed by a per-release PVC for cluster.dataDir. There is
no orchestration in the chart that ties the releases together for upgrade
purposes -- helm upgrade against one release cycles exactly one pod and waits for
it to come back. Cross-release coordination is the operator's job.
A few specific things that matter when upgrading a Helm-deployed cluster.
Snapshot first; the chart doesn't do it for you
The chart has no pre-upgrade hook that takes a database snapshot. You have to do
it yourself before running helm upgrade. From a shell with kubectl access:
kubectl exec -n <namespace> <leader-pod> -- \
ziti agent controller snapshot-db /persistent/pre-upgrade.db
The snapshot lands on the controller's PVC inside the pod. Copy it out
(kubectl cp) and keep it alongside the previous chart version somewhere you can
get to without the cluster.
Roll through releases one at a time
Upgrade each Helm release sequentially, waiting between them:
helm upgrade ziti-controller1 openziti/ziti-controller -f ctrl1-values.yaml --wait
# confirm the cluster sees ctrl1 at the new version
kubectl exec -n <namespace> <other-pod> -- ziti agent cluster list
helm upgrade ziti-controller2 ... --wait
# confirm again, then
helm upgrade ziti-controller3 ... --wait
--wait blocks only on the local release's pod becoming Ready, not on the
cluster as a whole being healthy. The intermediate cluster list is the only
signal that the upgraded node has rejoined the mesh and caught up.
Pin the chart major version
The chart's version and the app version are loosely coupled and chart-level
breaking changes do happen. The v2 -> v3 transition consolidated PKI (separate
ctrl-plane / web roots merged into one edge-signer root) and made cluster.mode a
required value. Major-version chart upgrades typically need additional steps beyond
just helm upgrade -- re-issuing routers' enrollments, restarting deployments,
removing orphaned cert-manager resources. Pin to a major version in your Helm
dependency (^3.0.0) so you don't get one of these silently as part of a routine
update.
Don't change clientApi.advertisedHost
The clientApi.advertisedHost value becomes part of every router and identity
enrollment that goes through that controller. Changing it on a running release
causes cert-manager to reissue the controller's cert with the new SAN, and existing
routers and SDK identities will then fail to reach the controller because they were
enrolled against the old FQDN. If you need to add a new DNS name, add it to
clientApi.dnsNames or clientApi.altDnsNames ahead of time so it's part of the
cert before any client needs it.
Existing operator-targeted upgrade procedure
The chart's README.md covers the chart-version-specific steps in more detail.
Skim it before any chart major-version upgrade, in particular the "Breaking Change"
notes if they apply to your version transition.
Rollback
If the upgrade is going wrong and you want to back out, the procedure depends on how far you've gotten.
Before any node finishes its first migration
If you've upgraded a node, started the new binary, but the schema migration hasn't yet run to completion, you can stop the new binary, replace it with the previous version, and start that -- the on-disk state is still in the old schema and the old binary will pick it up.
In practice this is a narrow window, because the migration runs early in startup and is usually fast. Don't count on being able to catch the upgrade here.
After at least one node has migrated
Once the new binary has run its schema migration, the on-disk state is in the new schema and the old binary won't understand it. The migration is one-way. Rollback means restoring from the pre-upgrade snapshot you took in Before You Upgrade, following the Total Cluster Loss procedure with the previous binary installed on each host.
You'll lose anything written to the journal between when the snapshot was taken and when you started the upgrade. That's why the snapshot at the start of the upgrade procedure matters -- it's the recovery point for this scenario.
When to actually roll back
Rollback is real cluster downtime followed by a re-bootstrap; it's not a step to take lightly. Some heuristics:
- A single node failing to start on the new binary is usually a config or environment problem, not a reason to roll back the whole cluster. Investigate the failure on that node before rolling back. The other nodes are still on the old version and the cluster is in read-only mode but otherwise functional.
- The whole cluster behaving incorrectly after every node has been upgraded (e.g., wrong API responses, leadership flapping, routers unable to enroll) is a stronger signal. If you can't isolate the problem within a short window, rolling back to the snapshot is a reasonable next step.